Closed
The issue concerns a heavily used shared pedestrian and cycle path that has fallen into poor condition due to lack of maintenance and inspection. The surface contains significant defects that pose safety risks, including potential damage to bicycles and pushchairs. In addition, the road and lane markings have largely faded, creating confusion between pedestrian and cyclist areas. Given the presence of a nearby nursery and frequent use by families, this situation presents an increased risk to public safety and requires urgent attention.
Reported via desktop in the Pavement Defect category anonymously at 12:36, Wednesday 8 July 2026 using FixMyStreet Pro
Sent to Bromley Council less than a minute later. FixMyStreet ref: 9753867.
I am writing to raise a formal complaint regarding significant defects on the shared pedestrian and cycle path, particularly concerning pavement condition and road markings.
As residents, we pay council tax regularly with the expectation that the local authority will carry out necessary inspections, maintenance, and improvements in a timely and proactive manner. However, I have not observed any evidence of routine inspection or preventative action in this area. It is concerning that residents are left to report such obvious issues, rather than the council implementing regular monitoring and maintenance programmes.
The area in question is heavily used by the public and is of particular sensitivity due to the presence of a nearby nursery. As a result, the route is frequently used by pedestrians, cyclists, and parents with pushchairs. Despite this, the path has deteriorated significantly and now presents multiple safety hazards.
There are substantial surface defects that are severe enough to damage bicycle wheels and pushchairs. In addition, the road and lane markings have almost completely faded, making it unclear which areas are designated for pedestrians and which are for cyclists. This creates confusion and increases the risk of accidents in an already busy environment.
Given the level of usage and the vulnerable users of this route, I urge you to treat this matter as a priority. Immediate repair works and reinstatement as well as clear markings are required to ensure public safety.
Updates
-
Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices
State changed to: In progress
Posted by Bromley Council
at 12:37, Wednesday 8 July 2026
-
We are continuing to investigate and working to resolve this report
Posted by Bromley Council
at 07:36, Friday 10 July 2026
-
In addition to the points mentioned above, the greenery along the road is constantly encroaching onto the carriageway, and broken branches from the trees pose a potential risk. Furthermore, litter is continuously accumulating on both sides of the road and requires regular cleaning every week. In addition, immediate action is required regarding the situation we previously reported to you.
Posted anonymously at 12:21, Monday 13 July 2026
-
Our contractor has been notified to take the appropriate action.
Posted by Bromley Council
at 11:16, Wednesday 15 July 2026
-
The order for this repair has been raised with the Council’s contractor and remains outstanding within their planned schedule of works. Please continue to bear with us. We anticipate an early resolution to this report from this point in time.
Posted by Bromley Council
at 09:18, Tuesday 25 August 2026
-
Appropriate action has been taken to resolve the issue.
State changed to: Fixed
Posted by Bromley Council
at 10:38, Tuesday 25 August 2026
-
Although remedial works appear to have been carried out previously, the work has clearly not resolved the underlying defects. The repair is inadequate and does not represent a proper or durable treatment of the path. The route remains extensively cracked and uneven, with a continuous longitudinal opening and numerous gaps large enough for a pedestrian’s foot or a bicycle wheel to become trapped. These defects present a clear risk of trips, falls and collisions, particularly for pedestrians, cyclists, children, older people and users of pushchairs or mobility aids. I respectfully request that the Council: Arrange an urgent inspection by a suitably qualified inspector. Carry out a proper investigation of the route from beginning to end, rather than inspecting only the previously repaired section. Assess the path against the applicable highway-maintenance, accessibility and public-safety requirements. Instruct competent specialists to undertake a proper, durable renewal of the path in accordance with the relevant standards and regulations. Review and correct the pedestrian/cycleway labelling, markings and layout to reduce the risk of conflict between users. Provide a written response confirming the inspection findings, the proposed remedial works, the responsible department or contractor, and the anticipated completion date. I would also ask the Council to review the quality of the previous repair and confirm why the location was recorded or represented as repaired when substantial defects remain in the same area and immediately beyond it.
State changed to: Open
Posted anonymously at 11:26, Thursday 27 August 2026
-
Any update ???
Posted anonymously at 11:50, Wednesday 2 September 2026
-
The area has been inspected and there are no further defects at investigatory levels present at this time. The road will continue to receive regular inspections and any actionable defects identified will have remedial works raised. Further deterioration can be reported as a new report via: https://fix.bromley.gov.uk
State changed to: Closed
Posted by Bromley Council
at 15:04, Wednesday 9 September 2026
Only the original reporter may leave updates. If you made the original report please log in to leave an update.