Blocked Drains Davies Way Car Park
Reported via iOS in the Roads/highways category anonymously at 18:43, Mon 9 January 2017
Sent to Warrington Borough Council 2 minutes later. FixMyStreet ref: 954923.
Again another example of leaves not being cleared in time and allowed to block drains. This floods every time it rains.
Updates
-
Good afternoon,
Thank you for contacting Warrington Borough Council.
The street services teams are currently working on a leaf clearance schedule. The schedule is in place to ensure we regularly clear the leaves in problem areas where we know there may be large volumes of fallen leaves that could cause an issue for pedestrians.
We will notify the street services team of your report and ask that they attend the area to clear the leaves. Please be advised if the area where you are reporting the leaf problem is not on our schedule, it may take up to 20 working days for the area to be cleared.
The case reference number is CRM 748996.
I have also logged the blocked gullies with our highways team.
A highways inspector will aim to inspect this report within the next 10 working days.
Any necessary work which meets our intervention levels will be programmed following this inspection. All works will be prioritised and in some cases may take several weeks to complete.
The case reference number is CRM 748997. It is not always possible for us to provide an update to each case. If you need to contact us regarding this issue please quote this reference number.
Did you know you can now report most council related issues directly to us via our mobile enabled website www.warrington.gov.uk/report
Kind regards,
WBC
Posted by Warrington Borough Council at 16:02, Tue 10 January 2017
-
The delay in resurfacing Whitbarrow Road both as it runs north from the junction with Brookfield Road and as it runs down to Bridgewater Street in Lymm is a disgrace. For several years now, as repair frequency will show, this has been amongst the worst road surfaces west of Chittagong! Attached are photos taken in a 100 metre stretch from the Brookfield Road junction. Please will you 1. Arrange for urgent repairs 2. Add some urgency to the plan outlined to Councillor Barr to complete the resurface in financial year 2016-17.
Posted anonymously at 15:59, Mon 13 February 2017
-
Good morning,
Thank you for contacting Warrington Borough Council.
I have forwarded your comments onto the engineers department, for a response as soon as possible.
Regards WBC
Posted by Warrington Borough Council at 11:31, Wed 15 February 2017
-
Good afternoon,
Thank you for contacting Warrington Borough Council.
A highways inspector will aim to inspect this area within the next 10 working days.
Any necessary work which meets our intervention levels will be programmed following this inspection. All works will be prioritised and in some cases may take several weeks to complete.
I have also forwarded your comments with regards to the resurfacing works onto the engineers team for consideration.
The case reference number is CRM 759317.
Kind regards
WBC
Posted by Warrington Borough Council at 16:06, Wed 15 February 2017