Action scheduled
Footpath damaged during recent pipeworks by large vehicles nhaving to mount the path to get round the corner
Reported via mobile in the Footpath / pavement problem category anonymously at 15:36, Sunday 19 April 2026 using FixMyStreet Pro
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 9318681.
Large damaged area of footpath caused by vehicles having to mount the path to get round the corner. It ha expiaed part of a metal pole that is a serioys trip hazzard
Updates
-
The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.
There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.
Posted by Buckinghamshire Council at 15:37, Sunday 19 April 2026
-
Update
The Highways Officer has attended the site and completed an inspection based on your report.
As a result of this inspection, we plan to resolve the issue reported within 6-8 weeks.
Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.
Regards
Buckinghamshire HighwaysState changed to: Action scheduled
Posted by Buckinghamshire Council at 14:58, Thursday 14 May 2026
This report is now closed to updates from the public. You can make a new report in the same location.