Action scheduled
51.94868,-0.87942 Ajacent to 56 Station Road Winslow
Reported via desktop in the Footpath / pavement problem category by Graham Saunders at 12:49, Friday 10 April 2026 using FixMyStreet Pro
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 9270081.
The kerb is about 2" high and at an angle of about 60 degrees when approached from the roadway, I live at nr 60 and my wife who is disabled has to cross this road on her mobility scooter to go to the town. Trying to bump up this kerb causes the handlebars to be wrenched sideways causing damage to her wrists (and the scooter). The alternative is to drive up the middle of the road until she can use a dropped kerb to a private crossover about 30 yards away. There is usually cars parked on both sides of Station Road restricting the through traffic to a single lane. Driving her scooter up the middle of this restricted lane is dangerous. A level transition from the un-adopted access road to the adopted footpath is needed to ameliorate this situaution. Previously this had been judged by Fix my Street as not being a problem. It obviously is. Your reconsideration of this matter will be appreciated
Updates
-
The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.
There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.
Posted by Buckinghamshire Council at 12:49, Friday 10 April 2026
-
Update
The Highways Officer has attended the site and completed an inspection based on your report.
As a result of this inspection, we plan to resolve the issue reported within 6-8 weeks.
Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.
Regards
Buckinghamshire HighwaysState changed to: Action scheduled
Posted by Buckinghamshire Council at 12:11, Monday 13 April 2026
This report is now closed to updates from the public. You can make a new report in the same location.