Back to all reports

Surface lifted

Reported in the Potholes category anonymously at 11:59, Mon 25 January 2010

Sent to Aberdeenshire Council 1 minute later

Surface of road has lifted and broken down into loose asphalt over a length of approx 22feet. This originally two seperate potholes which have now merged into one long one.
Kindly note that I have at Wester Blair for over 12 years and in that period except for the repair of potholes no road maintenance seems to have been conducted. The grass verges in some areas throughout the length of this road have grown into the road, reducing the original width and has caused some cracking and lifting of the road edges.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Still open, via questionnaire, 14:53, Tue 23 February 2010

  • Immediate problem of the large potholes has been fixed but the surface is still quite uneven.

    State changed to: Fixed

    Posted anonymously at 09:19, Wed 24 March 2010

This report is now closed to updates. You can make a new report in the same location.