Pavement surface breaking up
Reported via mobile in the Pothole large category anonymously at 10:59, Monday 9 March 2026 using FixMyStreet Pro
Sent to Bristol City Council 6 minutes later. FixMyStreet ref: 9072040.
Date of photograph: 9 March 2026 Location: Pedestrian footpath, 51.492063, -2.558883 (what3words: ///note.crush.deals) The photograph shows a significant and extensive area of footpath surface deterioration running along the boundary between the pedestrian footway and the carriageway. The surface has broken up substantially, exposing the sub-base aggregate beneath. The damage extends for a considerable length — estimated at several metres — running parallel to the kerb line. The deterioration includes large areas of displaced and fragmented tarmac, exposed loose stone and aggregate, and radiating crack lines extending into the surrounding footpath surface. The damage appears to be actively worsening, with loose debris scattered across the affected area. Immediate inspection and repair is requested under the council’s duty of care to maintain safe pedestrian infrastructure. The defect appears to meet or exceed the threshold for urgent intervention under standard highway safety inspection criteria.
Updates
-
A new enquiry has been raised for this issue.
Posted by Bristol City Council at 11:05, Monday 9 March 2026
-
This issue is currently under investigation. We'll provide updates on the outcome as soon as we can.
Posted by Bristol City Council at 15:55, Wednesday 11 March 2026
-
A job has been raised with our contractors to action this issue and appropriate repairs or maintenance will be undertaken as soon as they can.
Posted by Bristol City Council at 12:50, Thursday 23 April 2026
-
This issue requires further investigation. We'll provide updates on the outcome in due course.
Posted by Bristol City Council at 15:02, Tuesday 9 June 2026
Provide an update
Your information will only be used in accordance with our privacy policy
