You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Urgent Safety Concern – Severe Potholes on London Road, Widley

Reported via Android in the Pothole category anonymously at 09:32, Tuesday 3 March 2026

Sent to Hampshire County Council less than a minute later. FixMyStreet ref: 9034886.

I am writing to formally raise serious safety concerns regarding the deteriorating road surface and multiple potholes along London Road in the Widley area, particularly from around Widley Church through to the roundabout and beyond. As shown in the attached photographs, the carriageway has deteriorated significantly and now presents a clear danger to all road users. The potholes are deep, widespread, and situated within the main running line of traffic. Vehicles, including buses, are being forced to brake sharply or deviate from their lane position to avoid damage, increasing the risk of collision with oncoming traffic, parked vehicles, cyclists, and pedestrians. This route is regularly used by public service vehicles carrying passengers. Repeated impact with these defects is causing strain and potential damage to suspension, steering, tyres, and wheel alignment. Beyond the financial implications, this presents a genuine safety concern for passengers and drivers. There is also a heightened risk to local residents crossing near the church and bus stops. Drivers attempting to avoid the potholes may unintentionally drift from their normal road position. Cyclists are particularly vulnerable, as striking these defects could easily result in loss of control and serious injury. Given the traffic volume and the presence of pedestrians and public transport on this stretch of road, I must request that this matter is treated as urgent. At the very least, temporary repairs should be undertaken immediately to make the surface safe, followed by permanent reinstatement at the earliest opportunity. This is now a foreseeable and escalating safety risk. I would appreciate confirmation of when remedial works will be scheduled. Yours faithfully, Wayne Littlejohn Health & Safety Representative First Bus Solent

Updates

  • State changed to: In progress

    Updated by Hampshire County Council at 10:17, Tuesday 3 March 2026

  • State changed to: Action scheduled

    Updated by Hampshire County Council at 12:20, Tuesday 3 March 2026

Only the original reporter may leave updates. If you made the original report please log in to leave an update.