Back to all reports

Large hole in shared footway on bridge deck

Reported via Android in the Pavements/footpaths category by Martin Podevyn at 10:29, Mon 19 September 2016

Sent to Gateshead Borough Council 2 minutes later

A hole has appeared on the shared use footway that runs alongside the railway line on the bridge across the Derwent. It looks like the top surface of the deck has completely eroded between two timber boards that make up the structure below. The gap looks particularly dangerous for cycles as it is about the same width as a tyre and would no doubt dismount a rider. Many thanks.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Fixed the very next day, well done all involved.

    State changed to: Fixed

    Posted by Martin Podevyn at 13:59, Mon 17 October 2016

This report is now closed to updates. You can make a new report in the same location.