Closed
Lots of pot holes both sides of Greenway
Reported via mobile in the Pothole category anonymously at 20:49, Tuesday 17 February 2026
Sent to Oxfordshire County Council less than a minute later. FixMyStreet ref: 8943202.
I am writing to formally request urgent inspection and repair works to the single track road, Greenway.
Both sides of the single carriageway are in a severely deteriorated condition, with deep, crater-like potholes running along the edges of the road. All of these defects measure in excess of 40 mm in depth and over 150 mm in diameter, exceeding standard intervention thresholds and requiring immediate action.
At the end of 2025, frequent use of Greenway by heavy tankers travelling to and from the pump house has significantly accelerated the deterioration of the road surface. As a result, the current condition now poses a serious safety risk to pedestrians, cyclists, and children who regularly use this route. In addition, the defects present a high risk of damage to vehicle tyres and suspension systems, which may lead to claims being raised against the council.
To ensure any remedial works are durable and to prevent further deterioration caused by freeze–thaw cycles, I strongly recommend that an oil-based sealant is applied around the edges of the filled areas. This would reduce water ingress and significantly extend the lifespan of the repair.
I would appreciate it if the council could inspect and address this issue as a matter of urgency, given the safety implications and the ongoing risk of further damage.
Thank you for your prompt attention to this matter. I look forward to your response.
Council ref: ENQ261085534
Updates
-
Thank you for your enquiry. This issue has been passed onto the relevant team for investigation.
State changed to: Investigating
Posted by Oxfordshire County Council at 20:50, Tuesday 17 February 2026
-
Thank you for your report. Based on our assessment, the highlighted area does not currently meet the criteria for immediate intervention under our Highway Safety Inspection Policy. However, rest assured that we will continue to monitor this location during our routine statutory inspections. If you observe any deterioration or worsening of the issue, please feel free to open a new report. For further information on highway repairs and our risk assessment process, you can visit the Oxfordshire County Council’s website: https://www.oxfordshire.gov.uk/ residents/ roads-and-transport/ street-maintenance-z/ road-repairs
State changed to: Investigation complete
Posted by Oxfordshire County Council at 14:09, Monday 23 March 2026
This report is now closed to updates from the public. You can make a new report in the same location.