Investigating
Manhole chamber blocked
Reported via mobile in the Blocked/Damaged category anonymously at 13:45, Friday 23 January 2026 using FixMyStreet Pro
Sent to West Northamptonshire Council less than a minute later. FixMyStreet ref: 8751408.
This blocked manhole is causing water to flow between the two South Street junctions badly damaging the road surface. It appears that water from a ditch higher up Farthingstone Road and which runs into a drain 120 yards up is flowing out of the blocked manhole and down the road. The manhole chamber needs unblocking and probably root cutting. Reported via Weedon FLAG flood group.
Updates
-
Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
State changed to: Investigating
Posted by West Northamptonshire Council at 13:45, Friday 23 January 2026
-
Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the WNC Highways Inspection Manual, the defect meets the requirement for a Priority 2 repair. We will schedule a repair to be completed within 7 days.
Posted by West Northamptonshire Council at 13:55, Friday 30 January 2026
-
Investigation: Completed (Defect Found), Defect Repair: Scheduled
State changed to: Action scheduled
Posted by West Northamptonshire Council at 17:05, Friday 30 January 2026
-
Investigation: Completed (Defect Found), Defect Repair: Ongoing
State changed to: In progress
Posted by West Northamptonshire Council at 09:15, Thursday 5 February 2026
-
Investigation: Completed (Defect Found), Defect Repair: Defect Found
State changed to: Investigating
Posted by West Northamptonshire Council at 09:40, Wednesday 25 February 2026
-
Could you provide an update please and if possible let me know when your team is coming so I can liaise on behalf of the Weedon Flood Liaison Group
Posted anonymously at 08:58, Tuesday 21 April 2026
-
Investigation: Ongoing (Work Completed), Defect Repair: Defect Found - Our team attended the site on 2 February 2026 and carried out an initial investigation. They cleared the manhole and used high‑pressure water jetting for approximately one metre up to a blockage. During this work, water was observed rising through the road surface and verge, which suggests there may be multiple breaks in the drainage system. The manhole was heavily surcharged, and the volume of water was causing noticeable damage to the carriageway. Due to the high water levels, it was not possible to complete a CCTV inspection at that time.
Arrangements will now be made for the team to return to site to carry out further investigations once conditions allowPosted by West Northamptonshire Council at 15:31, Friday 24 April 2026
-
Investigation: Completed (Work Completed), Defect Repair: Defect Found - Our team attended the site on 2 February 2026 and carried out an initial investigation. They cleared the manhole and used high‑pressure water jetting for approximately one metre up to a blockage. During this work, water was observed rising through the road surface and verge, which suggests there may be multiple breaks in the drainage system. The manhole was heavily surcharged, and the volume of water was causing noticeable damage to the carriageway. Due to the high water levels, it was not possible to complete a CCTV inspection at that time.
Arrangements will now be made for the team to return to site to carry out further investigations once conditions allowPosted by West Northamptonshire Council at 13:10, Wednesday 27 May 2026
Provide an update