Fixed
Stop claiming this has been fixed
Reported via iOS in the Leaves or blossom category anonymously at 12:25, Monday 19 January 2026
Sent to Bristol City Council less than a minute later. FixMyStreet ref: 8719613.
Photos taken today Monday 19th January. Your email claims the issue has been fixed. It has not. The entire length of the wall that runs alongside the green area has not been touched. The gullies are completely blocked. The pavement is covered with rotting material and it floods. Either your subcontractor is lying or you are closing reports for some reason. This is a hazard because it is slippery. The entire length needs properly clearing including the section of pavement that runs from the Green up to. Emmaus House. The buildup of leaf litter means the pavement cannot drain and both of the drain calves and covers are completely clogged with rotting material. I’ve been reporting this for months since the summer when it was blocked then it is still blocked now. Please send someone to sort this out. This is a major pedestrian residential and Taurus route. It’s unacceptable that is in this state.
Updates
-
Thank you for taking the time to report this issue to Bristol City Council.
We are determined to improve the cleanliness of the city and your report helps us to take the action we need to get there.
Posted by Bristol City Council at 12:25, Monday 19 January 2026
-
State changed to: Action scheduled
Updated by Bristol City Council at 12:26, Monday 19 January 2026
-
Thank you for using Fix My Street to share this issue.
We are pleased to report that the issue you raised has been resolved.
Please continue to report street issues to help us keep Bristol clean and safe.
State changed to: Fixed
Posted by Bristol City Council at 05:23, Friday 30 January 2026
-
Partially cleared. Gully & drain shown running along side wall with cars still not touched.
State changed to: Open
Posted anonymously at 12:50, Monday 16 February 2026
Still open, via questionnaire -
Pretty much the same.
Posted anonymously at 13:25, Monday 16 March 2026
Still open, via questionnaire -
Yay, swept! Can this be kept of a regular rota? The very large oak at one end combined with the other trees on Bobby’s Green mean it fill often & fast. It also is a major issue once the drains get covered as it floods the path. The runoff towards Emmaus House also needs to be kept clear so water can reach the drain cover.
State changed to: Fixed
Posted anonymously at 13:41, Monday 13 April 2026
This report is now closed to updates from the public. You can make a new report in the same location.