The whole stretch of Brockhampton Lane from the barriers to The Hyde lane end is in a terrible state. The road is extremely uneven. The most recent repairs are pathetic. There’s a length of tarmac been placed which in itself is extremely uneven, the edges have given way already and the huge dip beyond was untouched and the repair finished to that.

Reported via mobile in the A pothole in road category anonymously at 15:24, Thu 21 August 2025

Sent to Gloucestershire County Council less than a minute later. FixMyStreet ref: 8057195.

The section on the long straight is particularly uneven and when cycling you are compelled to go along the middle of the road. However recently cracks have opened in the middle of the road which are wide enough to swallow a cycle tyre. Highly dangerous and the same has happpened at the other side of the railway crossing. Is it not time this road was fully resurfaced? Many cyclists go along here in preference to the dangerous Hyde lane. This must be the worst road in Gloucestershire. Please do something!

Updates

  • Thank you for reporting a pothole.

    First, a safety inspector will visit the location to assess whether a repair needs to be completed and plan the work needed. Works are prioritised based on the urgency of the situation. The council aim to repair all significant potholes (more than 4cm deep and 30cm wide) within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    We will provide updates about this report.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads. Visit www.gloucestershire.gov.uk/highways/roads/potholes to find out more.

    Thank you again for taking the time to report this issue.

    Highways Customer Services Team,
    Gloucestershire Highways

    Posted by Gloucestershire County Council at 15:24, Thu 21 August 2025

  • This pothole report has now been passed to the Safety Inspection Team for assessment.

    A safety inspector will make an assessment of the work needed and they will consider a number of factors, including the flow of traffic and the size of the pothole.

    If repair work is required, the pothole will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible. We aim to complete the repair work within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    An update on the outcome of the safety inspection will be provided.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Investigating

    Posted by Gloucestershire County Council at 08:59, Tue 26 August 2025

  • Work to repair this pothole has been planned. Work is usually completed within 28 days or sooner.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    We will let you know when the work is complete.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes

    Thank you,

    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Action scheduled

    Posted by Gloucestershire County Council at 13:40, Wed 12 November 2025

  • I am pleased to inform you this pothole has been repaired.

    Gloucestershire County Council is responsible for almost 6,000km of roads and each one is routinely inspected (on a monthly, quarterly or annual basis, depending on the type of road). Issues can develop quickly in between these inspections and residents help by reporting problems online.

    Our longer term plans to improve road conditions include patching, resurfacing and maintenance works, information can be found online at www.gloucestershire.gov.uk/highways.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Fixed

    Posted by Gloucestershire County Council at 19:46, Tue 9 December 2025