You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Just along the carriageway requires filling in as it’s a deep worn drop off from the road to the verge

Reported via mobile in the Pothole category anonymously at 20:16, Thu 17 July 2025 using FixMyStreet Pro

Sent to Cheshire East Council less than a minute later. FixMyStreet ref: 7895049.

The edge of the road that butts up against the tarmac has worn away and requires a stone infill it is happening on both sides of the road in places. A slow moving council truck with hard core is all that’s needed and a worker shoving the stone in the holes and trench that’s formed in places. If the council would supply me the infill I would be more than happy to take my trailer along the road with my partner driving slowly and I would pack the deep hole myself, if a child from shavington school drop in the holes/ trench along the road they will fall off and require medical attention or worse if there are car vans and trucks at the time!

Updates

  • Thank you for contacting Cheshire East Highways.  Your enquiry has been logged and passed to a member of our team. We will aim to assess and update your enquiry within 20 working days. As your enquiry progresses you will receive further updates.

    Posted by Cheshire East Council at 20:17, Thu 17 July 2025

This report is now closed to updates from the public. You can make a new report in the same location.