In progress
This part of the Litchborough Road needs resurfacing
Reported via iOS in the Potholes / Highway Condition category anonymously at 20:43, Fri 20 June 2025
Sent to West Northamptonshire Council less than a minute later. FixMyStreet ref: 7741141.
The rest of the Litchborough Road from Bugbrooke to A5 has been resurfaced but the right hand fork has not been. Why not
Updates
-
Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
State changed to: Investigating
Posted by West Northamptonshire Council at 20:43, Fri 20 June 2025
-
Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the WNC Highways Inspection Manual, the defect meets the requirement for a Priority 4 repair. We will schedule a repair to be completed within 26 weeks. Our current average response time for a Priority 4 repair is 52 days.
Posted by West Northamptonshire Council at 14:56, Fri 27 June 2025
-
This right hand arm of the road is used by all traffic wishing to turn right on to A5, so I can not understand why it wasn’t resurfaced at the same time as the rest of the Litchborough Road
Posted anonymously at 08:18, Sat 19 July 2025
Still open, via questionnaire -
Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. Schemes are currently prioritised using our HEAT prioritisation tool that takes in to account a variety of factors such as condition & network impact, these factors include further considerations like safety, condition & location. Schemes are then prioritised holistically whilst also taking into account different treatment types.
In the case of Litchborough Road, there were a number of edge defects which were present. It was felt the most cost-effective approach would be to patch those areas in readiness for surface dressing. The surface dressing itself seals the carriageway stopping water ingress, and immediately improves surface texture, in turn improving safety for road users.
The application of surface dressing needs to be timely. We want to do it before the road deteriorates too much, otherwise: (a) extra patching reduces cost effectiveness; (b) delaying sealing the carriageway with a dressing increases the chance of structural defects due to water ingress. Therefore, surface dressing sites generally do not look as worn out as sites requiring resurfacing or reconstruction, as is the case of the right-hand fork. Of course, this section will continue to be inspected in-line with agreed investigatory levels and safety defects attended to by the area team.
All sections are prioritised throughout the network, and the HEAT tool will continue to be used in order to do this as agreed with West Northamptonshire Council.
For more information about our services, please visit https://www.westnorthants.gov.uk/ parking-roads-and-transport
You can also keep up to date on highways by following us on Facebook and Twitter @wnhighwaysPosted by West Northamptonshire Council at 08:21, Wed 23 July 2025
-
Still open, via questionnaire, 16:12, Sat 16 August 2025
-
Investigation: Completed (Defect Found), Defect Repair: Scheduled
State changed to: Action scheduled
Posted by West Northamptonshire Council at 14:40, Mon 10 November 2025
-
Investigation: Completed (Defect Found), Defect Repair: Ongoing
State changed to: In progress
Posted by West Northamptonshire Council at 09:13, Mon 24 November 2025