Branches with spikes in the middle of cycle path.
Reported via mobile in the Vegetation blocking road or sign visibility - In the countryside category anonymously at 20:41, Mon 16 June 2025 using FixMyStreet Pro
Sent to Bath and North East Somerset Council less than a minute later. FixMyStreet ref: 7719599.
The cycle path after newbridge when joins the motorway going to Bath Spa University is severely overgrown. The motorway side has been cut but always the part where the cycle path changes from direction to Bristol to direction yo the university is full of branches and spikes that can punture the tires. I reported it last year and that was the last time was partially fixed I have to do a part myself but my mobility is not improving I cannot do the job for the council
Updates
-
It was still a problem last time I cycled that way - unless someone has been sent to cut back the brambles and the ground covering vegetation then it will still be a problem; though slightly worse as it keeps on growing and narrowing the access.
Posted anonymously at 15:06, Sat 28 June 2025
-
We've passed this report to another team in the council. They will carry out any further work needed. Sometimes it can take a little longer as a result.
We'll update this report once we've decide what action to take.
Category changed from ‘Obstructive vegetation’ to ‘Verge cutting required’
Posted by Bath and North East Somerset Council at 10:32, Mon 30 June 2025
Provide an update
Your information will only be used in accordance with our privacy policy
