You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here

Branches with spikes in the middle of cycle path.

Reported via mobile in the Vegetation blocking road or sign visibility - In the countryside category anonymously at 20:41, Mon 16 June 2025 using FixMyStreet Pro

Sent to Bath and North East Somerset Council less than a minute later. FixMyStreet ref: 7719599.

The cycle path after newbridge when joins the motorway going to Bath Spa University is severely overgrown. The motorway side has been cut but always the part where the cycle path changes from direction to Bristol to direction yo the university is full of branches and spikes that can punture the tires. I reported it last year and that was the last time was partially fixed I have to do a part myself but my mobility is not improving I cannot do the job for the council

Updates

  • The branches are over the middle of the cycle path and spikes can damage tyres

    Posted anonymously at 20:07, Wed 25 June 2025

  • It was still a problem last time I cycled that way - unless someone has been sent to cut back the brambles and the ground covering vegetation then it will still be a problem; though slightly worse as it keeps on growing and narrowing the access.

    Posted anonymously at 15:06, Sat 28 June 2025

  • We've passed this report to another team in the council. They will carry out any further work needed. Sometimes it can take a little longer as a result.

    We'll update this report once we've decide what action to take.

    Category changed from ‘Obstructive vegetation’ to ‘Verge cutting required’

    Posted by Bath and North East Somerset Council at 10:32, Mon 30 June 2025

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a FixMyStreet password?