Action scheduled
11 Goughs Lane
Reported via desktop in the Gully/Drainage category anonymously at 11:58, Thu 8 May 2025 using FixMyStreet Pro
Sent to Cheshire East Council less than a minute later. FixMyStreet ref: 7539437.
Good morning. Mr Hatton of Gordon Hatton drains inspected the property. Mr Hatton has advised that foul drains at the property running okay but still require repairs. He reported that the surface water drains are not flowing and are blocked. They are silted up and are unlikely to cope with any significant rainfall, possibly leading to ground flooding. He believes that the road drains are blocked as he cannot clear the drains in the garden. I am hoping to make an insurance claim in order to rectify this problem but cannot do so until the blockage in the area for which you are responsible has been cleared. Could you do this soon as the work needs to be done before damage is done to the property? Thank you. Nigel Atkinson
Updates
-
Thank you for contacting Cheshire East Highways. Your enquiry has been logged and passed to a member of our team. We will aim to assess and update your enquiry within 20 working days. As your enquiry progresses you will receive further updates.
Posted by Cheshire East Council at 11:58, Thu 8 May 2025
-
State changed to: In progress
Updated by Cheshire East Council at 21:51, Thu 8 May 2025
-
This update is to inform you that your enquiry has been assessed and an ad-hoc jetting job has been raised. Our jetting sites are scored on a risk based matrix, higher scoring gullies will be priority. However, if there is any immediate threat to the property or highways safety requiring an emergency response then we ask that this is telephoned through to the team on 0300 123 5020 between 8:30am – 5:00pm or outside of these hours, contact our out of hours team on 0300 123 5025.
Thank you for taking the time to contact Cheshire East Highways.State changed to: Open
Posted by Cheshire East Council at 15:00, Tue 27 May 2025
-
A job has been raised and scheduled to be carried out by Cheshire East Highways following the enquiry you logged.
We’ll provide a further update once the work is completed. While we make every effort to keep to the programme, dates can change due to unforeseen factors, such as weather and budget availability.State changed to: Action scheduled
Posted by Cheshire East Council at 15:04, Thu 5 June 2025
This report is now closed to updates from the public. You can make a new report in the same location.