Fixed
Poor condition of footbridge surfacing
Reported via mobile in the Pavements/footpaths category by Paul Rimmer at 16:13, Sat 22 March 2025
Sent to Glasgow City Council less than a minute later. FixMyStreet ref: 7319840.
The condition of the footway surfacing on the footbridge over the railway is very poor. It is unsuitable for walking, buggies, wheeling and cycling.
Updates
-
I haven't been that way recently.
Posted by Paul Rimmer at 13:40, Sun 20 April 2025
-
Crossed the bridge on 14 May and the surface was still appalling and not just for bikes. Anyone in a wheelchair or using a buggy would find it difficult.
Posted by Paul Rimmer at 14:33, Mon 19 May 2025
Still open, via questionnaire -
The moon is smoother than this bridge's surface right now. Absolutely abysmal. Any other pavement in such a condition would have been resurfaced well before now.
Posted anonymously at 10:09, Sat 14 June 2025
-
Sorry, not been this way recently so can't say.
Posted anonymously at 16:36, Sat 14 June 2025
-
I went over the footbridge on 18 June 2025 and there was no improvement to the surface.
Posted by Paul Rimmer at 14:35, Sun 22 June 2025
Still open, via questionnaire -
Still open, via questionnaire, 17:22, Mon 21 July 2025
-
I went over the bridge on 13 August 2025 and the surface is still in need of repair. Nothing has happened.
Posted by Paul Rimmer at 23:03, Mon 18 August 2025
Still open, via questionnaire -
Just about to email the Council about it as I have subsequently found out it is a core path route.
Posted by Paul Rimmer at 16:48, Tue 16 September 2025
Still open, via questionnaire -
I crossed the bridge today (07/11/2025) and it had been resurfaced. It wasn't the smoothest of surfaces but it was very much better than what was there before.
State changed to: Fixed
Posted anonymously at 17:36, Fri 7 November 2025
This report is now closed to updates from the public. You can make a new report in the same location.