Pavement between Sunnybank & Sunnyside driveways
Reported via desktop in the Gully/Drainage category anonymously at 17:32, Fri 13 December 2024 using FixMyStreet Pro
Sent to Cheshire East Council less than a minute later. FixMyStreet ref: 6859702.
The road was recently resurfaced - despite discussing with engineers in attendance no action was taken to repair and raise the pavement level which is now BELOW the new roadway tarmac - result standing water and mud after rain on the pedestrian route. This is where the road is down to a single carriageway with traffic competing from both directions. In freezing conditions this is iced - significant danger of fall/slip at a point where pedestrians are in danger anyway. Why wasn't the pedestrian path raised at the time the road re-surfacing was done?
Updates
-
Thank you for contacting Cheshire East Highways. Your enquiry has been logged and passed to a member of our team. We will aim to assess and update your enquiry within 20 working days. As your enquiry progresses you will receive further updates.
Posted by Cheshire East Council at 17:32, Fri 13 December 2024
-
This update is to inform you that your enquiry has been assessed and an ad-hoc jetting job has been raised. Our jetting sites are scored on a risk based matrix, higher scoring gullies will be priority. However, if there is any immediate threat to the property or highways safety requiring an emergency response then we ask that this is telephoned through to the team on 0300 123 5020 between 8:30am – 5:00pm or outside of these hours, contact our out of hours team on 0300 123 5025.
Thank you for taking the time to contact Cheshire East Highways.Posted by Cheshire East Council at 12:58, Tue 24 December 2024
This report is now closed to updates from the public. You can make a new report in the same location.
