Action scheduled
At Pedestrian crossing
Reported via mobile in the Carriageway category anonymously at 18:53, Tue 29 October 2024 using FixMyStreet Pro
Sent to Cheshire East Council less than a minute later. FixMyStreet ref: 6673254.
Crossing impassable due to flood during all episodes of rainfall. Had to cross further down road and hope no vehicle drove through flood.
This needs an additional drain installing into the existing drainage run to drain water from low spot which is at crossing point.
I am a Chartered Civil Engineer so please don’t reply that floods are normal, this is a poor design and drainage and road levels were ignored when designing and installing.
Updates
-
Thank you for contacting Cheshire East Highways. Your enquiry has been logged and passed to a member of our team. We will aim to assess and update your enquiry within 20 working days. As your enquiry progresses you will receive further updates.
Posted by Cheshire East Council at 18:53, Tue 29 October 2024
-
We have arranged for jetting work to be carried out. At this present time, we are unable to indicate a timescale for these works, until the necessary funding and resource becomes available.
State changed to: Action scheduled
Posted by Cheshire East Council at 11:51, Thu 31 October 2024
This report is now closed to updates from the public. You can make a new report in the same location.