You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

More dangerous potholes

Reported via desktop in the A pothole in road category anonymously at 18:38, Sunday 15 September 2024 using FixMyStreet Pro

Sent to Gloucestershire County Council less than a minute later. FixMyStreet ref: 6474387.

There are multiple potholes, across the entire width of this narrow lane, and stretching from from the drive to Grove Lodge to the entrance to Grove View. Many exceed 60mm in depth. Many are larger than 400mm. It is impossible to avoid them as the lane is not wide enough to drive around them. I cannot ride by bicycle here; it is too dangerous and I will fall off.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a pothole.

    First, a safety inspector will visit the location to assess whether a repair needs to be completed and plan the work needed. Works are prioritised based on the urgency of the situation. The council aim to repair all significant potholes (more than 4cm deep and 30cm wide) within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    We will provide updates about this report.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads. Visit www.gloucestershire.gov.uk/highways/roads/potholes to find out more.

    Thank you again for taking the time to report this issue.

    Highways Customer Services Team,
    Gloucestershire Highways

    Posted by Gloucestershire County Council at 18:39, Sunday 15 September 2024

  • This pothole report has now been passed to the Safety Inspection Team for assessment.

    A safety inspector will make an assessment of the work needed and they will consider a number of factors, including the flow of traffic and the size of the pothole.

    If repair work is required, the pothole will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible. We aim to complete the repair work within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    An update on the outcome of the safety inspection will be provided.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Investigating

    Posted by Gloucestershire County Council at 13:31, Monday 16 September 2024

  • State changed to: Open

    Updated by Gloucestershire County Council at 10:42, Tuesday 17 September 2024

  • This pothole report has now been passed to the Safety Inspection Team for assessment.

    A safety inspector will make an assessment of the work needed and they will consider a number of factors, including the flow of traffic and the size of the pothole.

    If repair work is required, the pothole will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible. We aim to complete the repair work within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    An update on the outcome of the safety inspection will be provided.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Investigating

    Posted by Gloucestershire County Council at 11:01, Tuesday 17 September 2024

  • State changed to: Open

    Updated by Gloucestershire County Council at 14:36, Wednesday 18 September 2024

  • This enquiry has been addressed, no further updates will be shared here. If you are the original reporter you should have received a seperate communication with more detail.

    On our website you can find out about planned work to maintain and improve Gloucestershire's streets by visiting www.gloucestershire.gov.uk/highways.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    State changed to: Closed

    Posted by Gloucestershire County Council at 10:32, Wednesday 9 October 2024

This report is now closed to updates from the public. You can make a new report in the same location.