Closed
Road surface very badly damaged
Reported via mobile in the Road Defect category anonymously at 06:37, Wed 26 June 2024 using FixMyStreet Pro
Sent to Bromley Council less than a minute later. FixMyStreet ref: 6155225.
Massive crack down the middle of the road. Approx 10-20m long. Lots of potholes surrounding
Updates
-
Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices
State changed to: In progress
Posted by Bromley Council
at 06:38, Wed 26 June 2024
-
Our contractor has been notified to take the appropriate action.
Posted by Bromley Council
at 12:05, Wed 26 June 2024
-
In need of attention
Posted anonymously at 06:35, Thu 27 June 2024
-
Appropriate action has been taken to resolve the issue.
State changed to: Fixed
Posted by Bromley Council
at 10:34, Fri 26 July 2024
-
Thank you for your update, The area reported will be regularly monitored and defects which meet the London Borough Of Bromley investigatory levels will be considered for repair and further works raised when/ if necessary.
State changed to: Fixed
Posted by Bromley Council
at 11:18, Fri 13 September 2024
-
Why are you not fixing this right way. The holes that were left are just as bad as the ones that got filled already.
Why were they not all done at the same time? You filled a hole 40 cm from these holes, just extend the work.
This is both a waste of money and time.
How do residents claim for damaged cars?
Appreciate it’s not whoever is reading this’ fault, but this seams a bit ridiculous.
Thanks
State changed to: Open
Posted anonymously at 12:49, Fri 13 September 2024
-
Thank you for your update, The area reported has been inspected and defects which met the London Borough of Bromley investigatory levels were referred to our contractor to arrange repair. The area will be regularly monitored and further works raised when/ if necessary. The investigatory levels for repair in the footway are trips of 20mm or above, or if the slabs are loose and rocking severely. Paving is not replaced if just cracked. In the Carriageway it is for localised immediate vertical deflections measuring 30mm deep or more in the trafficked directions. This does not mean that all defects that reach this level will be repaired, just that they may be considered for repair.
Posted by Bromley Council
at 10:07, Wed 25 September 2024
-
Any request for compensation relating to an issue on a Bromley maintained highway must be processed via an insurance claim process. Bromley currently have a shared Insurance Service with Sutton Council and an online claim form can be completed and submitted via Sutton’s website: https://www.sutton.gov.uk/ info/ 200436/ customer_services/ 1146/ insurance_service/ 2
State changed to: Closed
Posted by Bromley Council
at 10:16, Wed 25 September 2024
This report is now closed to updates from the public. You can make a new report in the same location.