You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Drains

Reported via desktop in the Blocked Drain category by Keith Rowland at 12:03, Tue 2 April 2024 using FixMyStreet Pro

Sent to Bromley Council less than a minute later. FixMyStreet ref: 5794942.

I have reported this drain on more than one occasion it is full to the brim with road aggregate from Orchard Road. This has been blocked for well over 6 months and when it rains large pools of standing water accumulates

Asset ID: 730021279

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices

    State changed to: In progress

    Posted by Bromley Council at 12:04, Tue 2 April 2024

  • Bromley Council are aware of this issue as it has either been brought to our attention already or we have existing job(s) within our schedule of works to address it. We will look to investigate and resolve the issue within our service standards: http://www.bromley.gov.uk/ fixservices Thank you once again for using ‘FixMyStreet’ to report this issue. If this problem persists, please provide further comments to the report.

    State changed to: Duplicate

    Posted by Bromley Council at 13:44, Thu 11 April 2024

  • Hi, Thank you for removing the road aggregate from both drains but unfortunately they are both still blocked and further investigation is needed to clear the drain pipes of a blockage

    Posted anonymously at 12:29, Mon 6 May 2024

  • Thanks for your update, we have instructed the contractors to return and jet the connections. This will be done as soon as it can be arranged.

    State changed to: In progress

    Posted by Bromley Council at 13:52, Fri 31 May 2024

  • The drainage assets have been attended by our drainage contractor however the source of the issue appears to be more complex than a simple routine cleanse. As such further investigation work will be required using CCTV. These need to be scheduled alongside cyclic drainage cleans, emergency call outs, pre-planned drainage operations and ad-hoc call outs meaning they are often undertaken not in the order that they are reported but in the order of degree of urgency. Due to the expense of CCTV investigations, they are also undertaken in bulk. Therefore, non-urgent CCTV work may take some time to complete. While this FixMyStreet report will be closed the issue will remain on our list of outstanding drainage works until such time that they can be completed. We thank you for your patience and understanding on these matters.

    State changed to: Closed

    Posted by Bromley Council at 14:34, Tue 23 July 2024

This report is now closed to updates from the public. You can make a new report in the same location.