Blocked drains

Reported via desktop in the Blocked/Damaged category anonymously at 14:05, Fri 16 February 2024

Sent to Northamptonshire Highways less than a minute later. FixMyStreet ref: 5586915.

This problem was first reported Oct/Nov 2023 and there have been numerous photos sent along with updates. The latest report number is 5464599 which has now been closed ppresumably because the work has been carried out. However the road in question is still under water the drains are so badly blocked that you can't see them for silt. In other words the situation is now worse than when first reported.Many photos have been sent.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 14:06, Fri 16 February 2024

  • Ditch is blocked at the bottom of Furnace Lane, Eastern side, overflowing and adding to flood problem.Needs digging out because vegetation is growing in it .

    Posted anonymously at 10:41, Thu 22 February 2024

  • Whilst someone has been out and looked at the drains outside the cottages this was not the real problem. The original repor related to the drains either side of the bridge. The flood water was pumped out but there is still silt about 4 inches deep and other rubble that needs clearing or the drains will get blocked again. PLEASE CALL ME AND LET ME KNOW YOUR INTENTIONS AS TO WHEN YOU WILL GET IT SORTED.

    Posted anonymously at 14:48, Fri 15 March 2024
    Still open, via questionnaire

  • Can Highways please update on this matter ?

    Posted anonymously at 23:04, Thu 21 March 2024

  • Whilst the sweeper has been out the debris on the road is now cleared. However the silt about 5 ins deep under the railway bridge is still there. It only needs to rain again and the road will be flooded. This was first reported in October 2023 and I ask that this is now dealt with as a matter of urgency.

    Posted anonymously at 15:42, Fri 12 April 2024
    Still open, via questionnaire

  • The silt has not been removed and is gradually getting worse.

    Posted anonymously at 20:14, Fri 10 May 2024
    Still open, via questionnaire

  • The original report was because as a result of flooding the drains under the bridge were blocked. These have been cleared but the silt which is at least 4 inches deep remains and is still causing problems. Please make sure this matter is dealt with as it is now more than 3 months since originally reported.

    Posted anonymously at 07:56, Sat 8 June 2024
    Still open, via questionnaire

  • The silt is still under the bridge and has been there so long that weeds are now starting to grow. It doesn't seem to make any difference how many times the problem is reported NOTHING GETS DONE.

    Posted anonymously at 12:53, Sat 6 July 2024
    Still open, via questionnaire

  • As already reported several times the silt is still under the bridge. Do not send out the road sweeper as although a good job is done IT ISN'T solving the problem. The onlt thing that will help is if the silt is removed. All it will take is some men with spades so surely that is not too difficult and the work can be scheduled.

    Posted anonymously at 13:24, Sat 3 August 2024
    Still open, via questionnaire

  • Still open, via questionnaire, 14:56, Sat 31 August 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and we can confirm that in accordance with the NNC Highways Inspection Manual, the defect meets the requirement for a Priority 3 repair. We will schedule a repair to be completed within 28 days. Our current average response time for a Priority 3 repair is 26.5 days.

    Posted by Northamptonshire Highways at 15:17, Fri 6 September 2024

  • Investigation: Completed (Defect Found), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 07:12, Tue 24 September 2024

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing

    State changed to: In progress

    Posted by Northamptonshire Highways at 09:31, Wed 25 September 2024

  • Investigation: Completed (Defect Found), Defect Repair: Work Completed

    State changed to: Fixed

    Posted by Northamptonshire Highways at 15:27, Friday 7 March 2025

This report is now closed to updates from the public. You can make a new report in the same location.