Blocked drains in Berrywood road causing flooding when raining
Reported via desktop in the Blocked/Damaged category anonymously at 11:12, Fri 30 June 2023 using FixMyStreet Pro
Sent to Northamptonshire Highways less than a minute later. FixMyStreet ref: 4734625.
The drains from the junction of Ryeland Road down to Main Road are blocked and every time it rains there is a small river flowing down Berrywood road. This is causing pedestrians to be splashed by passing vehicles, who have no room to manoeuvre when traffic is both sides of the road. Looking at the drains when it is dry and you can see they are blocked approx 2 inches below the drain grating. Both sides of Berrywood road are blocked but the worst blocked drains are on the side nearest the allotments
Updates
-
Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
State changed to: Investigating
Posted by Northamptonshire Highways at 11:13, Fri 30 June 2023
-
Investigation: Completed (Defect Found), Defect Repair: Not Started - The area has been inspected and work has been scheduled to be carried out within the next 28 days
For more information about our services, please visit https://www.westnorthants.gov.uk/ parking-roads-and-transport
You can also keep up to date on highways by following us on Facebook and Twitter @wnhighwaysPosted by Northamptonshire Highways at 10:14, Mon 3 July 2023
-
Waterfall drain pictured at roundabout/ junction of Ryeland Road / Berrywood Road is overflowing every time it rains even a small rainfall this causes a small river flowing down Berrywood road, this also continues long after the rain has passed. Causing vehicles to verve into the centre of the road to avoid the said running river. Pictured/Video 2/nov/23 9am long after the rain has passed
Posted anonymously at 09:42, Thu 2 November 2023
-
Thank you for providing an update. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
Posted by Northamptonshire Highways at 09:42, Thu 2 November 2023
-
Investigation: Completed (Defect Found), Defect Repair: Not Started - The area has been inspected and work has been scheduled to be carried out within the next 28 days
For more information about our services, please visit https://www.westnorthants.gov.uk/ parking-roads-and-transport
You can also keep up to date on highways by following us on Facebook and Twitter @wnhighwaysPosted by Northamptonshire Highways at 10:09, Fri 3 November 2023
-
Investigation: Completed (Defect Found), Defect Repair: Scheduled
State changed to: Action scheduled
Posted by Northamptonshire Highways at 21:37, Sun 19 November 2023
-
Investigation: Completed (Defect Found), Defect Repair: Ongoing
State changed to: In progress
Posted by Northamptonshire Highways at 20:17, Mon 20 November 2023
-
Investigation: Completed (Defect Found), Defect Repair: Work Completed
State changed to: Fixed
Posted by Northamptonshire Highways at 21:00, Tue 12 December 2023
This report is now closed to updates from the public. You can make a new report in the same location.