Verge overgrown

Reported via desktop in the Restricted Visibility / Overgrown / Overhanging category anonymously at 13:21, Mon 12 June 2023 using FixMyStreet Pro

Sent to Northamptonshire Highways less than a minute later. FixMyStreet ref: 4661258.

A4500 Wellingborough Road from Northampton to Wellingborough. Fooway needs siding out. the first section for northhampton to ecton is shared use cycle/pedestrian. this was reported last year and no works was carried out. from ecton to wellingborough footway needs siding out it overgrown and its is narrow to walk on busy road. Also it is difficult with pushchair

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 13:22, Mon 12 June 2023

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Regarding the condition of the verge adjacent to Wellingborough Road, we are pleased to confirm that a works order has been raised. This should be completed within 12 months’ time. Please be assured that you will receive an update once repairs are concluded. We usually find these defects are tended to within 26 weeks.

    Posted by Northamptonshire Highways at 14:22, Mon 19 June 2023

  • Further to my report 4118107, this cycleway remains unsatisfactory. Only a flail has been used. From the bridge over the brook (first photo with railings) up to Ecton, over half of this neglected path has been covered by ever encroaching earth and vegetation. Two cyclists with a combined approach speed of 30mph cannot possibly pass safely. It now needs a lorry followed by a front loader shovel to scrape off the inches thick overlay and remove it to restore the path to its original width.

    Posted by Dr John Fitton at 20:25, Thu 3 August 2023

  • Thank you for providing an update. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    Posted by Northamptonshire Highways at 20:25, Thu 3 August 2023

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Regarding the condition of the verge adjacent to Wellingborough Road, we are pleased to confirm that a works order has been raised. This should be completed within 12 months’ time. Please be assured that you will receive an update once repairs are concluded. We usually find these defects are tended to within 26 weeks. To see further updates please see 4118107 on mystreetdoctor.

    Posted by Northamptonshire Highways at 10:14, Tue 8 August 2023

  • As at 16 May 2024, this still has not been done. The pavement is as narrow as 30cm in places. As per your service level agreement, 26 weeks was up on the 06 Feb 2024. This is now 14 weeks overdue.

    Posted anonymously at 15:43, Fri 17 May 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - An inspector has been sent to the area and we hope to have this resolved by June 19th 2024
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways

    Posted by Northamptonshire Highways at 09:42, Fri 24 May 2024

  • As per the comment on the 3rd August 2023, the path has now been cleared with a flail so the nettles are no longer encroaching the path, however the path itself has still not been cleared and is still as narrow in places. When cycling along this path I have to ride next to the kerb, but because I'm on a pavement, the traffic on the road does not give space as if I was on the road and they pass me very closely.

    Posted anonymously at 16:01, Fri 12 July 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and carried out an immediate semi-permanent repair. We will continue to monitor the condition as part of our routine highway inspection schedule. Should you notice the defect worsening, please inform us via an update to your existing enquiry.

    Posted by Northamptonshire Highways at 15:38, Fri 19 July 2024

  • I would like to know how how you can carry our semi permanent repair? As the vegetarian needed siding out. This has been going on for 3 years and nothing has been done

    Posted anonymously at 20:50, Fri 19 July 2024

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry. A qualified Highways Inspector has assessed the location and carried out an immediate semi-permanent repair. We will continue to monitor the condition as part of our routine highway inspection schedule. Should you notice the defect worsening, please inform us via an update to your existing enquiry.
    For more information about our services, please visit https://www.northnorthants.gov.uk/ parking-roads-and-transport
    You can also keep up to date on highways by following us on Facebook and Twitter @nnchighways

    Posted by Northamptonshire Highways at 13:02, Fri 26 July 2024

Provide an update