Drain grid support broken and adjacent road degraded significantlly

Reported via desktop in the Potholes / Highway Condition category anonymously at 13:15, Sun 2 April 2023 using FixMyStreet Pro

Sent to Northamptonshire Highways less than a minute later. FixMyStreet ref: 4388592.

The drain cover surround has broken away and the surrounding road asphalt has disintegrated significantly. The cover is probably not supported adequately and water now by-passes the drain cover as the gap created is now so large. There is a safety issue as there is no walkway adjacent so pedestrians have to walk on this part of the road. The degradation has progressed over a period of two years but in recent months it has accelerated as to be expected. The drain is immediately outside 23 Broadlands, Raunds, NN9 6QL

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 13:15, Sun 2 April 2023

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Regarding this section of Broadlands, we can confirm that the carriageway defects that meet the investigatory level for repairs, have work scheduled to resolve them. This should be completed within amonths’ time. Please be assured that you will receive an update once repairs are concluded.

    Posted by Northamptonshire Highways at 14:25, Mon 3 April 2023

  • Investigation: Completed (Defect Found), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 13:26, Thu 26 October 2023

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing

    State changed to: In progress

    Posted by Northamptonshire Highways at 09:55, Mon 30 October 2023

  • Investigation: Completed (Defect Found), Defect Repair: Completed (Work Completed)

    State changed to: Fixed

    Posted by Northamptonshire Highways at 10:25, Mon 30 October 2023

This report is now closed to updates from the public. You can make a new report in the same location.