You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new
report here
Reposition
report here
Back to all reports

, There is a pothole and length of road surface that needs urgent attention outside my property. The problem is next to the kerb in the carriageway and is adjacent to my very old flint wall. Vehicles hitting the hole are causing vibrations which is affecting the wall and flints are being loosened. The defect needs immediate attention please. If the wall collapses it could kill someone. If attention is needed to the wall then I shall be looking for rebuilding costs from the council, I’d stress again the urgency of the matter.

Reported via mobile in the Road Defect category anonymously at 08:30, Friday 24 March 2023 using FixMyStreet Pro

Sent to Bromley Council less than a minute later. FixMyStreet ref: 4352626.

There is a pothole and length of road surface that needs urgent attention outside my property. The problem is next to the kerb in the carriageway and is adjacent to my very old flint wall. Vehicles hitting the hole are causing vibrations which is affecting the wall and flints are being loosened. The defect needs immediate attention please. If the wall collapses it could kill someone. If attention is needed to the wall then I shall be looking for rebuilding costs from the council, I’d stress again the urgency of the matter.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices

    State changed to: In progress

    Posted by Bromley Council at 08:31, Friday 24 March 2023

  • The problem is opposite

    1 Ivy Cottages Bucks Cross Road Chelsfield Kent

    State changed to: Open

    Posted anonymously at 08:33, Friday 24 March 2023

  • We are continuing to investigate and working to resolve this report

    State changed to: In progress

    Posted by Bromley Council at 08:31, Monday 3 April 2023

  • Our contractor has been notified to take the appropriate action.

    Posted by Bromley Council at 16:58, Tuesday 4 April 2023

  • The pot hole is getting worse the longer it is left

    Posted anonymously at 16:02, Friday 21 April 2023

  • Thank you for your further comments regarding this issue. Bromley are aware of the significant volume of works raised and outstanding with our contractor and we are continuing to monitor and liaise with them over this outstanding schedule of works. Our Officers are not able to give precise timeframes to individual jobs at this moment but are continuing to undertake regular safety inspections and check any reported issues. We will continue to work with our contractor to ensure that all outstanding jobs are addressed as quickly as they are able.

    Posted by Bromley Council at 16:05, Friday 21 April 2023

  • This continues to deteriorate.

    Posted anonymously at 09:51, Tuesday 25 April 2023

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a FixMyStreet password?