3 drains outside 34-38 are blocked with leaves causing flooding into property
Reported via mobile in the Blocked/Damaged category anonymously at 19:42, Sat 2 October 2021 using FixMyStreet Pro
Sent to Northamptonshire Highways less than a minute later. FixMyStreet ref: 3038208.
The three soak away drains outside 34-38 High Street, Hardingstone are blocked, the middle one almost full with leaves. This is causing the footpath to be completely flooded and water flooding onto the properties steps. When it is heavy, given the hill, all water runs this way and it is impossible to leave your property without wading through water. The aftermath is dirty silt, mud left on the path causing major trip hazard, especially given the slope of the path and on properties.
Updates
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 19:43, Sat 2 October 2021
-
State changed to: In progress
Updated by Northamptonshire Highways at 13:09, Tue 5 October 2021
-
This report has been assessed and a job for repair has been raised.
State changed to: Action scheduled
Posted by Northamptonshire Highways at 13:10, Tue 5 October 2021
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 13:13, Tue 5 October 2021
-
This report has been assessed and a job for repair has been raised.
State changed to: Action scheduled
Posted by Northamptonshire Highways at 13:15, Tue 5 October 2021
-
Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of a drain in this area; specifically that you mention it is blocked. We are pleased to confirm that cyclic cleansing of the drains and gullies on the adopted highway will commence, in the near future. This should be completed within the next month.
State changed to: In progress
Posted by Northamptonshire Highways at 14:45, Tue 5 October 2021
-
Thank you for reporting a fault on the highway, the highways team have now resolved the issue.
State changed to: Fixed
Posted by Northamptonshire Highways at 13:15, Tue 14 December 2021