Back to all reports

Workmans equipment

Reported in the Roads/highways category by Patricia Line of Wylde Green Neighbourhood Forum. at 17:38, Sun 6 September 2020

Sent to Birmingham City Council less than a minute later

Graffittstandi was successfully carried out at this point of the railway bridge at Cheste Road Station and the majority of the workmens equipment has be successfully picked up but one stand and a bag of something still remain on the corner by the barriers alongside the main Chester Road. The weeds which had grown around the abandoned equipment still remain and as they are growing in height could possibly cause obstruction and affect visibility for outgoing traffic. The residual equipment therefore still needs collecting and weeds removed or sprayed to make the site clean and maintained. .

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • The workmans stand is still at the same site, which is lying down flat and the bag of something still remains there too. Majority of the stuff originally advised of were removed, so it is baffling why the stand and bag of something were left there?!

    Posted by Patricia Line of Wylde Green Neighbourhood Forum. at 21:54, Sun 4 October 2020
    Still open, via questionnaire

  • One workmans sign plus a bag of something is still lying on the floor where the other workmens stuff was collected from.

    Posted by Patricia Line of Wylde Green Neighbourhood Forum. at 11:24, Mon 2 November 2020
    Still open, via questionnaire

  • Still open, via questionnaire, 15:37, Mon 30 November 2020

Provide an update

Please note that updates are not sent to the council. Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?