About 30 potholes along Westfield road, several are very large and take up most of the road. They are up to 6 inches deep. There is also a rough raised area as you turn onto Westfield road from Sleaford ( like a large speed bump), it means you have to almost stop to turn in from the A15 which has a 60 mph limit, this makes it very dangerous as people don't expect you to stop when turning left.

Reported in the Pothole on road/cycleway category anonymously at 15:25, Thu 3 September 2020 using FixMyStreet Pro

Sent to Lincolnshire County Council less than a minute later. Council ref: 375931.

The potholes have been getting steadily worse all summer but the recent rain has made them almost impassable. The raised rough area at the junction with the A15 is especially dangerous.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting this issue. Due to the COVID-19 pandemic we may not be able to meet our usual response times. We are doing everything we can to maintain resource levels to provide your highways service. Thank you for your patience.

    Posted by Lincolnshire County Council at 15:26, Thu 3 September 2020

  • We need to investigate this report. We will contact you again when an update is available. We are sorry that during the COVID-19 pandemic situation we may take longer to respond than normal. Thank you for your patience.

    State changed to: Investigating

    Posted by Lincolnshire County Council at 07:26, Fri 4 September 2020

  • This report has been assessed and a job for repair has been raised. We will contact you again when a further update is available.

    State changed to: In progress

    Posted by Lincolnshire County Council at 12:22, Tue 8 September 2020

  • Works are scheduled.

    State changed to: Action scheduled

    Posted by Lincolnshire County Council at 11:57, Tue 29 September 2020

  • Someone (probably the farmer) has dumped a load of rubble in the potholes.

    Posted anonymously at 17:52, Tue 29 September 2020

  • The area where the farmer carried out the bodged repair has deteriorated and the potholes are now deeper than ever due to the raised surface. This issue has been showing as scheduled for fixing for some time but nothing has happened. This is extremely disappointing because the condition of the road (wet and muddy) means when the pothole are eventually repaired the first winter ice will lift the repair and it will be back to the usual state. This section of road needs a proper repair not just some tarmac squashed into the hole which is what normally happens.

    Posted anonymously at 17:57, Thu 19 November 2020

  • Thank you for your report. We will investigate and make an update to this report within 14 days.

    State changed to: Open

    Posted by Lincolnshire County Council at 10:01, Fri 20 November 2020

  • Works are scheduled.

    State changed to: Action scheduled

    Posted by Lincolnshire County Council at 17:01, Mon 23 November 2020

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?