Back to all reports

Blocked and silted up drains in Station Road Outside Butlers Flooring Shop and house by name of Aubreen

Reported in the Blocked drain category anonymously at 12:43, Monday 27 January 2020

Received by Buckinghamshire Council moments later

These two drains have been blocked for too long and every time there is heavy rain the road gets flooded which causes pedestrians and the buildings to get soaked. This problem needs urgent action ideally no later than the next 2 weeks

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 12:46, Monday 27 January 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 10:36, Saturday 1 February 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 10:36, Saturday 1 February 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 10:36, Saturday 1 February 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 11:53, Monday 3 February 2020

  • This area is constantly flooding in heavy rain

    Posted anonymously at 13:10, Monday 24 February 2020
    Still open, via questionnaire

  • Questionnaire filled in by problem reporter

    State changed to: Fixed

    Posted anonymously at 15:27, Monday 23 March 2020

This report is now closed to updates. You can make a new report in the same location.