You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Road surface destroyed by construction traffic needs replacing

Reported via Android in the Roads/highways category anonymously at 19:01, Sun 8 December 2019

Sent to Hampshire County Council 5 minutes later. FixMyStreet ref: 1879668.

The road surface at the exit from Southleigh Road has been destroyed as a result of all of the construction traffic for the Bellway development. It is uneven and hazardous, especially to cycle and motorcycle traffic. It needs resurfacing as soon as possible.

Updates

  • Told by HCC that it doesn't need sorting. Clearly very low standards in their Engineers department.

    Posted anonymously at 19:45, Sun 5 January 2020
    Still open, via questionnaire

Only the original reporter may leave updates. If you made the original report please log in to leave an update.