Status unknown
Norfolk Trail ploughed up
Reported in the Footpaths/ Rights of way (usually not tarmac) category anonymously at 12:19, Wed 27 December 2017
Sent to Norfolk County Council 1 minute later. FixMyStreet ref: 1168195.
Paston FP 1: The entire path across two arable fields, has been left in a deep, roughly ploughed state. The attempt at reinstatement is grossly inadequate. A single pair of wheelings, roughly attempted; each wheeling is merely 0.3 metres in width, separated by a 1.1 metre width of rough ploughed soil.
Updates
-
No change as at 12th January 2018. NCC ref: ENQ-139565.
Posted anonymously at 14:49, Fri 12 January 2018
-
...And still no change as at 20th January. Some, adequately sure-footed people have been managing to use it, but the photos show the continued lack of any level surface. Still no indication from the county council as to their intentions pursuant to their issue ref: 139565.
Posted anonymously at 15:03, Sat 20 January 2018
-
No change as at 5th February 2018. Message issued by Norfolk CC on 5th February 2018: "No action has been taken at this time but we will continue to monitor the problem -We have assessed that the defect does not currently meet our intervention criteria. We will continue to monitor as part of normal scheduled inspections."
Posted anonymously at 23:35, Mon 5 February 2018
-
No change to the condition of the surface as of 16th February 2018.
Posted anonymously at 18:34, Fri 16 February 2018
-
Three and a half months on from the report, and four months since the path was ploughed up, still no reinstatement. Photo taken 14.4.2018. The path looks a bot smoother now, than back in December, thanks to weathering of the ploughed surface, and treading by those members of the public who are able to use the path... but still a lamentably uneven surface.
Posted anonymously at 11:57, Sat 14 April 2018
-
By 7th May 2018 the path surface was still as rough as ever (first attached photo). By 9th May 2018 the field had been drilled, and the path marked out, by the farmer, now with a smoother surface.
THE NORFOLK COUNTY COUNCIL NEVER DID ENFORCE THE REINSTATEMENT OF THE PATH, THE WHOLE TIME DURING WHICH THE FIELD WAS IN THE ROUGH PLOUGHED STATE - RIGHT FROM DECEMBER 2017 UNTIL 9TH MAY 2018 WHEN THE FARMER CULTIVATED.THE FIELD.
Posted anonymously at 15:55, Fri 11 May 2018