Needs repair

Reported in the Potholes category by kevin may at 13:19, Fri 20 August 2010
Sent to West Sussex County Council 1 minute later

Five pot holes need repairs and the kurb stones on the left hand side of the road need resetting as the refuse lorry runs over the kurb when it backs into the close

Offensive? Unsuitable? Tell us

More problems nearby

Updates

Posted by kevin may at 19:30, Fri 3 September 2010

A bodged job is not the the word one hole fixed four holes left to get bigger and one kerb stone pushed back and a small patch of tarmac to hold in place great british workmanship take a look for a laugh

Posted by kevin may at 20:43, Fri 3 September 2010

A bodged job is not the the word one hole fixed four holes left to get bigger and one kerb stone pushed back and a small patch of tarmac to hold in place great british workmanship take a look for a laugh

Posted by kevin may at 21:00, Fri 17 September 2010

A very poor repair one pot hole was repaired the other four where left to get bigger and the kerb stones where pushed back in place an d a small patch of tarmac to hold in place

Posted by kevin may at 20:36, Tue 9 November 2010

As the holes where not repaired in the last report one hole is very large and could damage cars could someone please repair thanks

Provide an update

Please note that updates are not sent to the council. If you leave your name it will be public. Your information will only be used in accordance with our privacy policy

Now to submit your update… do you have a FixMyStreet password?

No, let me confirm my update by email:

(we never show your email)

Providing a password is optional, but doing so will allow you to more easily report problems, leave updates and manage your reports.