Unfinished Work
Reported in the Potholes category by Mr CD Lingard at 19:39, Mon 5 July 2010
Sent to North East Lincolnshire Council less than a minute later
Two or three days ago, contractors moved in and repaired some potholes in Elm Road which had occurred last winter. However, they did not finish the job; two or three potholes remain untouched.
Offensive? Unsuitable? Tell us
Updates
Further to my report on 5th July, the work has not been done by 1700 today 22nd July. I therefore submit photograph of the potholes in question.
The problem has not been fixed to date: 2nd Aug. The location of the potholes necessitates driving into them each time a vehicle wishes to leave Elm Road. By attempting to avoid them places the effected vehicle in harms way should another vehicle wish to enter Elm Road.
The potholes are still there. I suspect that the Council feels that since vehicles move over the potholes slowly, as they are nearing the junction, that they can leave them as they are. However, the fact remains each vehicle leaving Elm Road for Cheapside tends to occupy the middle of the road in order to avaoid the holes. Thus presenting a risk to traffic trying to enter.